2025 – Canada

  • Ridley Island Energy Export Facility (REEF) - It is a large-scale ($1.2B) liquefied petroleum gas (LPG) and bulk liquids terminal and marine berthing and loading facility on Ridley Island at the Port of Prince Rupert. Project Management services to AltaGas through Gas Liquids Engineering (GLE) in the role of Integration Manager.

  • Future Energy Park (FEP) - located within the City of Calgary, it is a $1.2B Waste-to-Energy RNG and Ethanol Project to be constructed in a 21-hectare site. It is a first-in-kind CO2 negative renewable biofuels facility that combines Bioethanol, Biogas, and RNG Upgrade proven international technologies to produce renewable gas, power, CCUS, and animal food from a low-grade/non-human quality wheat. The project is planned to start construction in 2025 with completion expected in 2027. Project Management services to Green Impact Partners (GIP) through Gas Liquids Engineering (GLE) in the Owner’s Engineering role.

2024 – Canada

  • Ridley Island Energy Export Facility (REEF) - It is a large-scale ($1.2B) liquefied petroleum gas (LPG) and bulk liquids terminal and marine berthing and loading facility on Ridley Island at the Port of Prince Rupert. Project Management services to AltaGas through Gas Liquids Engineering (GLE) in the role of Integration Manager.

  • Future Energy Park (FEP) - located within the City of Calgary, it is a $1.2B Waste-to-Energy RNG and Ethanol Project to be constructed in a 21-hectare site. It is a first-in-kind CO2 negative renewable biofuels facility that combines Bioethanol, Biogas, and RNG Upgrade proven international technologies to produce renewable gas, power, CCUS, and animal food from a low-grade/non-human quality wheat. The project is planned to start construction in 2025 with completion expected in 2027. Project Management services to Green Impact Partners (GIP) through Gas Liquids Engineering (GLE) in the Owner’s Engineering role.

2023 – Canada

  • Future Energy Park (FEP) - this Green Energy Mega-Project ($1.2B+) is a low carbon intensity biofuel, renewable natural gas and renewable power facility to be constructed in the City of Calgary, Alberta. Project Management services to Green Impact Partners (GIP) through Gas Liquids Engineering (GLE) in the Owner’s Engineering role.

  • Iowa RNG - Including 3 different dairy farms - the scope consists in upgrading Biogas to RNG (Renewable Natural Gas) quality to be injected into a third-party pipeline. Project located near Sioux City in USA. Project Controls Management services to Green Impact Partners (GIP) through Gas Liquids Engineering (GLE).

  • GreenGas Colorado - Including 2 different dairy farms (Lost Creek & Prospect Valley) - the scope consists in upgrading Biogas to RNG (Renewable Natural Gas) quality to be injected into Xcel Energy pipeline with connection to the interstate system. Project located near Denver in USA. Project Controls Management services to Green Impact Partners (GIP) through Gas Liquids Engineering (GLE).

2022 – Canada

  • Iowa RNG - Including 3 different dairy farms - the scope consists in upgrading Biogas to RNG (Renewable Natural Gas) quality to be injected into client’s pipeline. Project located near Sioux City in USA. Project Controls Management services to Green Impact Partners.

  • Swan Hills Co-Produced Geothermal Natural Gas Hybrid Project - This unique project, the first one in its kind in Canada, considers the combined operation of an Organic Rankine Cycle (ORC) turbine, the geothermal technology, together with a Solar Titan-130 Natural Gas Turbine (NGT) to produce 21MW to be sell to Alberta power grid. Project Management services to FutEra Power Corp.

  • Future Energy Park (FEP) - this project is a low carbon intensity biofuel, renewable natural gas and renewable power facility to be constructed in the City of Calgary, Alberta. Project Controls Management services to Green Impact Partners.

  • GreenGas Colorado - Including 2 different dairy farms (Lost Creek & Prospect Valley) - the scope consists in upgrading Biogas to RNG (Renewable Natural Gas) quality to be injected into Xcel Energy pipeline with connection to the interstate system. Project located near Denver in USA. Project Controls Management services to Green Impact Partners (GIP).

2021 – Canada

  • GreenGas Colorado - Lost Creek - the scope consists in upgrading Biogas to RNG (Renewable Natural Gas) quality to be injected into Xcel Energy pipeline with connection to the interstate system. Project located near Denver in USA. Project Controls Management services to Green Impact Partners.

  • GreenGas Colorado - Prospect Valley - the scope consists in upgrading Biogas to RNG (Renewable Natural Gas) quality to be injected into Xcel Energy pipeline with connection to the interstate system. Project located near Denver in USA. Project Controls Management services to Green Impact Partners.

  • Côté Gold Project. $2.2B. Contracted by Wood Plc., the scope consists in an open pit gold mine with 36,000 tonnes/day capacity (367,000 gold ounces/year), including processing plant, tailing and water management, for operator IAMGOLD Corporation in a 70/30 JV with Sumitomo Metal Mining, in northern Ontario. Project Controls, site planning services.

2019 to 2021 – Canada (as employee of NorthRiver Midstream Ltd.)

  • Tupper West 2 Expansion Project, which consisted in a new 200mmscfd Gas Processing facility (TPW2) adjacent to the existing Tupper West Plant (TPW1), a new Booster Compressor Station, a new 18 km 138kV Transmission Line (HVTL), and a new 138kV Sub-Station (HVSS). Project Controls and PMO Services

  • North-East British Columbia (NEBC) Connector, consisting of a +200km twinned pipeline with a Pump Station. Pre-FEED and FEED. Project Controls and PMO Services

  • Elk River Liquids Hub, former Monias Liquids Hub, consisting of a Gas Fractionation and Storage Facility, Truck and Rail Terminals, and a pipeline. Pre-FEED and FEED. Project Controls and PMO Services

  • McMahon 2020 Turnaround projects, including: A Train Repairs; Sulfur Plant piping replacement; C2 Condenser Replacement; Burner upgrades; Flare Line Replacement; Flare Stack Replacement; Cooling Water piping repairs; Station 1 McMahon Raw Inlet Gas Header Replacement; CS1 Deactivation; CS1 Modernization; and many others. Project Controls and PMO Services

  • Dawson 2020 Turnaround projects, including: Amine Make-up Tanks installation and many others. Project Controls Services

  • Over 100 small Sustaining Capital projects, Growth Tie-Ins, as well as one-time projects like asbestos removal, floods restauration, As-Built, and many others. Project Control Services

2019 – Canada

  • Northeast British Columbia (NEBC) Program which includes Townsend Complex expansion (Townsend Deep Cut Facility), Pipelines, North Pine Fractionator and Rail Terminal. BC. Canada: Project Controls Services. AltaGas Ltd.

  • Alton Natural Gas Storage Project (capacity up to 10 bcf of natural gas) – Alton. Nova Scotia. Canada: Project Controls Services. AltaGas Ltd.

  • Ridley Island Propane Export Terminal Project (capacity up to 1.2 million Tonnes) – Prince Rupert. BC. Canada: Project Controls Services. AltaGas Ltd.

2018 – Canada

  • Wapiti Program Phase 1a – In-Plant Modifications (WLGF - Pipestone Inlet and Blending Facilities) and Short-Term Solution (KGCS - STS): Construction Planning/Scheduling Services. Keyera through PCBL.

  • Wapiti Program Phase 1 (150mmscfd Liquids Handling & Gas Plant - WLGF; and Gold Creek Gas Compression Station - KGCS): Construction Planning/Scheduling Services. Keyera through PCBL.

  • Cheecham Sulphur Handling Project. Keyera: Project Management Services through Rangeland Engineering Canada Corporation. Calgary. Alberta.

  • KJT C4 Offloading Project. Keyera: Project Management Services through Rangeland Engineering Canada Corporation. Calgary. Alberta.

  • Empress and Prince Rupert Terminal Projects. Pembina: Project Planning & Scheduling Services through Rangeland Engineering. Calgary. Alberta.

  • Various small-medium projects (KFS-CIPE; KFS-Truck Loading Conversion; KFS-Cavern 7B Manifold Update; KFS-Cavern 5B Mode Conversion; PDH Pipeline Connection; and others) Keyera: Project Planning & Scheduling Services through Rangeland Engineering. Calgary. Alberta.

2017 – Canada

  • Cheecham Sulphur Handling Project. FEED. Keyera: Project Management Services through Rangeland Engineering. Calgary. Alberta.

  • ATCO Heartland Energy Center Office. Detail Engineering and Construction Support.  ATCO Energy Services: Project Management Services through Rangeland Engineering. Calgary. Alberta.

  • Various small-medium projects (KFS-CIPE; KFS-NBPP; CDH-IQ System). Keyera: Project Planning & Scheduling Services through Rangeland Engineering. Calgary. Alberta.

  • Outrider Project. BC. Pembina: Project Planning & Scheduling Services through Rangeland Engineering. Calgary. Alberta.

2016 – Canada

  • Townsend Program: +$480M. Includes a 200mmscfd Gas Refrigeration Plant; gathering, sales & egress pipelines; and a Tank-Truck Terminal. Project was delivered 5 weeks ahead of plan & +10% under budget. Also provided services as Project Controls Director for the EPC Division (+$1B portfolio) covering from East to West Coast, including USA. AltaGas Ltd.

2015 – Canada

  • Baseline Tank Terminal Project: Project Management Services for Detailed Design and Construction Phases. Kinder Morgan Canada Terminals (KMCT) and Keyera

  • Edmonton Rail Terminal Project: +$300MM 50/50 JV with IOL. High-capacity Crude Oil Terminal (+220k bbpd - 76 Loading Spots) capable to deliver through CN & CP mainlines. Managed in parallel +14 Construction companies (659 man-peak) & 3 Engineering houses. Project Management Services for Construction & Commissioning Phases, and MOC execution. Kinder Morgan Canada Terminals (KMCT) and Imperial Oil (IOL).

2014 – Canada

  • Edmonton Rail Terminal Project. Project Management Services for Construction Phase. Kinder Morgan Canada Terminals (KMCT)

  • Understanding and Managing Fast Track Projects - 2014. Project Management Course. Global Innovative Campus (GIC)

2013 – Canada (as employee of Athabasca Oil Corporation - AOC - or independent professional)

  • Hangingstone Phase 1. SAGD Project. Readiness for Operations. Planning and Procurement Services. AOC

  • Hangingstone Phase 2 & 3. SAGD Project. Project Controls Services. AOC

  • Understanding and Managing Fast Track Projects - 2013. Project Management Course. Global Innovative Campus (GIC)

  • Dover West Reservoir. Cogen Project for SAGD projects support

2012 – Canada (as employee of Athabasca Oil Corporation)

  • Dover West Reservoir. SAGD Project Phase 2&3. Project Controls Services. Athabasca Oil Corporation (AOC)

  • Dover West Reservoir. Infrastructure Projects: Roads, Power Supply Line, Telecommunication Towers, etc. Project Controls Services. AOC

  • Dover West Reservoir. SAGD Project. 12,000 bbpd. Project Controls. AOC

  • Dover West Reservoir. TAGD Pilot Project. Project Controls Services. AOC

  • Heater Assembly Facility. Project Controls Services. AOC

  • Project Controls’ Fundamentals, Procedures and Work Instructions. Management Support and Assistance. AOC

2009 to 2012 – Canada (as employee of Husky Energy)

  • Sunrise Oil Sands Project (2.5B$). SAGD Project. OTSG-WLS Technology. DBM, FEED, and Execution Phases, Project Controls & Planning Services for the Upstream Facilities (Oil Process and Field Facilities), Drilling & Completion, Midstream, and Infrastructure. Husky Energy

2008 – Canada (as employee of Husky Energy)

  • Sunrise Oil Sands Project. SAGD Project. MDB-MVC Technology. DBM and Transition to Execution Phases. Project Controls & Planning Services. Husky Energy

2006 to 2008 – Canada (as employee of Jacobs Canada)

  • Project Controls, Planning for the Sulphur Complex in the “Suncor Voyageur Upgrader Project”. Engineering and Procurement phases. Jacobs Canada

2006 – USA (as employee of Americas Energy Company - AEC)

  • Project Controls & Planning Support for the KAYAN Project. Petrochemical Plant for Saudi Arabia. (Aprox. 1 million Man-Hours for Engineering Phase). KBR Energy and Chemicals

  • Project Controls, Planning and Reporting Support for the GASSI TOUIL LNG Project. LNG Plant in Arsew, Algeria, for RGS – JV between Repsol, Gas Natural & Sonatrach. Scope: EPC for Single Train 4.0 MMTPY using APCI Liquefaction (44 Mo to RFSU). KBR Energy and Chemicals

  • Engineering Service Agreement with Williams International (Tulsa, OK). AEC

  • Engineering Service Agreement with KBR Energy & Chemicals (Houston, TX). AEC

  • Engineering Service Agreement with ABB Lumus (Houston, TX). AEC

  • Engineering Service Agreement with Jacobs Engineering (Houston, TX). AEC

  • Engineering Service Agreement with FMC Technologies (Corpus Christi, TX). AEC

  • Technical and Marketing Advising. Sisteca Consultores C.A.

  • Support in Oil & Gas technical issues and in international business new developments in USA. Sisteca Consultores C.A.

2004 to 2005 – Venezuela (as employee of China National Petroleum Corporation - CNPC)

  • Dehydration and Desalting Trains System Plant (Bitumen). Client: Orifuels-Sinoven S.A. (Chinese – Venezuelan Company). EPC Project aprox. 2 Years duration with a US$ +85 million budget. CNPC Services Venezuela LTD SA (China National Petroleum Corporation)

2003 – Venezuela (as employee of Corporacion In Solidum - CISSA)

  • Civil construction and restoration for industrial buildings, service water facilities and access roads.

2002 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA)

  • Automation of Compressor Plant JUS-1 y 2. PDVSA. E&P

  • Gas & Fire Detection System in Compressor Plant JUS-1 y 2. PDVSA. E&P

  • Fire Detection System in Compressor Plant JUS-6. PDVSA. E&P

  • Facilities and Wells Automation. Orocual Field. PDVSA. E&P

  • Automation of Compressor Plant JUS-6. PDVSA. E&P

  • Flow-meters installation in Water Wells, Plant RESOR. PDVSA. E&P

  • Intruders Detection System in High Risky Wells, Furrial Field. PDVSA. E&P

  • Santa Bárbara Oil Segregation (Orocual – Jusepín Section). PDVSA. E&P

  • AUTOFITRA (Oil Metering and Automation - Orocual and Jusepín Tank Farms). PDVSA. E&P

  • Flow-meters installation in Water Wells, Plant RESOR. PDVSA. E&P

  • Well Testing Automation. PDVSA. E&P

  • Flow Station Orocual 3. PDVSA. E&P

  • Wells Automation. Orocual Field. PRAP 2000. PDVSA. E&P

  • Oil Production and Water Injection Wells Automation. Year 2000. PDVSA. E&P

  • Manifolds and Wells Automation, Furrial 99. PDVSA. E&P

  • Testing Pipe and Oil Pipeline 16” Automation. PDVSA. E&P

  • Supply and Installation of Actuators SRM in El Furrial field wells. PDVSA. E&P

  • Supply and Installation of Intruders Detection System for Wells. PDVSA. E&P

  • Power Line Construction. Double 3-line 34,5 Kv, Jusepín-Orocual. PDVSA. E&P

2001 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA)

  • Manage of oil-water in Flow Station Orocual-1 (EF-ORC-1). PDVSA. E&P

  • Repairing of access roads to Orocual and Jusepín Operational Complexes. PDVSA. E&P

  • KOD replacement in EF-ORC-1 (Flow Station). PDVSA. E&P

  • Rain water drainage in Jusepín Modules (Compression Plant Complex) PDVSA. E&P

  • Orocual field Macro-Pit access facilities. PDVSA. E&P

  • Chemical Injection Packages El Furrial field and Jusepín Complex. PDVSA. E&P

  • EPC- Gas Dehydration Plant in EF-ORC-3 (Flow Station). PDVSA. E&P

2000 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA)

  • Rain Water Disposal System Jusepín Complex. PDVSA. E&P

  • Quiriquire River Dike Restoration. PDVSA. E&P

  • PDV Vehicles Gasoline Stations in States of Anzoátegui, Monagas and Bolívar States. PDVSA. E&P

  • Instrumentation and Automation of Injection and natural flow Wells, lines and EF-Orocual-2. PDVSA. E&P

1999 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA)

  • Year 2000 (Y2K) Project: Remediation, Mitigation and Contingency Actions for 56 Compression Gas Plants. PDVSA – E&P – West Division.

  • Enlarging and Construction of Flow Stations: EF-CC9 / EF-DD9 / EF-CC11 (Bachaquero). EF-W5 / EF-V6 / EF-X6 (Laguna). EF-D4 / E4 / C6 (Tía Juana). PDVSA. E&P

  • Manage of APBN Oil Type. PDVSA. E&P

  • Manage of Tía Juana Este Oil type. PDVSA. E&P

  • Relocation and Enlarging of Rainstorm Drainage Station LS-604. Tía Juana. PDVSA. E&P

  • Automatic Transfer in Power Supply for Rainstorm Critical Drainages. PDVSA. E&P

1998 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA)

  • Updating of Fire Detection System. Phases 1 and 2. Plant F-6. Tía Juana. PDVSA. E&P

  • Relocation and Enlarging of Drainage Station LS-604. Tía Juana. PDVSA. E&P

  • Manage of Tia Juana Mediano and Cabimas Oil Types trough Lagoven facilities. PDVSA. E&P

  • Construction Hot – Line from TANKS FARM Bachaquero to Lagunillas. PDVSA. E&P

  • Update Effluents Plant in TANKS FARM Lagunillas. PDVSA. E&P

  • Repairing of Furnaces Insulation in Power Plant. Las Morochas. PDVSA. E&P

1997 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA)

  • Rain protection bells in Power Plant Pueblo Viejo. MARAVEN

  • Warehouse & workshop in TANKS FARM Bachaquero. MARAVEN

  • Hanging bridge in Sibaragua River. MARAVEN

  • Parking lot and warehouse roofs in Lagunillas, Las Morochas and Bachaquero Oil Fields. MARAVEN

  • Reconditioning of Flow-braker (El Vigía Distribution Plant). MARAVEN

  • Drainage System (San Lorenzo Distribution Plant, Pueblo Viejo Power Plant and PV-HH-8). MARAVEN

  • Lagunillas Central Workshop. MARAVEN

  • Pump foundations in Tank Farm Bachaquero. MARAVEN

  • Testing Vessels for Flow Stations. MARAVEN

  • Relief System Bridges (EF-8/3 y EF-7/7). MARAVEN

  • Reconditioning of PA-11/1 y PA-1/7. MARAVEN

  • Lama Plant offshore works (Adapting of Relief System, Auxiliary 24 volts system, installation of thermocouples and quick-shot valves). Maracaibo Lake. MARAVEN

  • Enlarge of Lagotreco Oil Manifolds and Gas lift. Maracaibo Lake. MARAVEN

  • Gas-ducts Adaptation (pig receivers in 9 EF’s) Lagomedio. Maracaibo Lake. MARAVEN

  • Bottle neck deleting in EF-14/3. Maracaibo Lake. MARAVEN

  • Lagunillas Self Consuming Station tank. MARAVEN

  • Bachaquero and Tía Juana multi-port valves. MARAVEN

  • Lighting improvement for Puerto Miranda Tanks Farm. MARAVEN

  • Floating-Flow-Station facilities at EF-17/1. MARAVEN

  • Flow Station DD-10 Interconnection. MARAVEN

  • Gas manifold installation at Unigas Plant. Maracaibo Lake. MARAVEN

  • Drum and drainage optimization at Lago-I Plant. MARAVEN

  • Operational improvement at PELM Power Plant. MARAVEN

1996 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA)

  • Fast track Plan MS’97. MARAVEN

  • Drainages / Laboratories / A/C at Lake Maracaibo East Shore schools. MARAVEN

  • Offshore Platform PE-15/1 Reestablishment. MARAVEN

  • Lagomar offshore building Cafeteria. MARAVEN

  • Transformers Mobil Oil Depurator. MARAVEN

  • Reconditioning of Motatán-2 Plant. MARAVEN

  • Life Quality facilities at Lago-I Plant, Maracaibo Lake. MARAVEN

  • Disposal water drainage at PV-E4. MARAVEN

  • Lagunillas Module-2 Parking lot. MARAVEN

  • Pumping and discharge at EF-7/9. Maracaibo Lake. MARAVEN

  • Motatán-3 alternative measuring system. MARAVEN\

  • PE-15/1 Replacement. MARAVEN

  • Multi-port and Agar installation at Barúa-5 Plant. MARAVEN

  • Mechanical works at Lagogas-3 and PV-E4. Maracaibo Lake. MARAVEN

  • East Shore Production Modules Construction. MARAVEN

  • Floating-Flow-Station facilities at EF-1/12. MARAVEN

  • Pumps installation at PV-MM6. MARAVEN

  • Mayor maintenance at EF-LL4, EF-RR7, EF-MM8, EF-R10, Block-4 Water Plants. Maracaibo Lake. MARAVEN

1995 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA)

  • Maintenance of Perforation towers. MARAVEN

  • Stairs and supports at Unigas-I. MARAVEN

  • Lagomar Quality Module at Lagogas-II. MARAVEN

  • Parking lot roofs. Lagunillas. MARAVEN

  • Flexible supports for steam lines. MARAVEN

  • Warehouse for Central Workshop. MARAVEN

  • Drainages / Multiples Uses Saloon / Offices / bathrooms in Maracaibo Lake East Shore schools. MARAVEN

  • Diver training tank. CEPET (PDVSA Training Subsidiary)

  • Life Quality Module at Lago-I Plant, Maracaibo Lake Block I. MARAVEN

  • HH-8 Steam Plant. MARAVEN

  • Crain Bridge, dock, Offices, Modular Equipment AVAC, drainages and enclosures in San Francisco area. MARAVEN

  • Lama-III Plant cranes. MARAVEN

  • Lamargas Heliport. MARAVEN

  • San Lorenzo Gas line relocation. MARAVEN

  • Reconditioning of EF-3/9 relief system. MARAVEN

  • Lake plants HVAC Systems. MARAVEN

  • Floating-Flow-Station connections at Lake Flow Stations. MARAVEN

  • Maracaibo Lake Block-I and Block-5 Water Plants reconditioning. MARAVEN

  • Mobil Booster Station. MARAVEN

  • Drums and manifolds reconditioning at Barúa-Motatán area. MARAVEN

1994 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA)

  • Bachaquero Clinic Drainages. MARAVEN

  • Lagunillas schools’ warehouses and showrooms. MARAVEN

  • Waste water drainage systems for Maracaibo Lake East Coast schools. MARAVEN

  • Training well. CEPET Tamare (PDVSA Training Subsidiary)

  • Crane access facilities at Lama-Generación Plant.  MARAVEN

  • Reconditioning of Carabobo Club swimming pool area. MARAVEN

  • EF-H5 Tanks area. MARAVEN

  • Lagunillas Southern dock wave-resistance system. MARAVEN

  • Latino Bank Lagunillas. Latino Bank

  • LAGO-I relief system. MARAVEN

  • EF-8 Boscán MARAVEN

  • San Francisco dock Bridge-Crane. MARAVEN

  • Demolition of Cooler tower number 3. La Paz. MARAVEN

  • Tanks Replacement at EF-2/6 and EF-5/6. MARAVEN

  • Salmuera Tank T-6. MARAVEN

  • Bachaquero High Mast modification. MARAVEN

  • Blocks-I-IX Dry Gas operation. MARAVEN

  • Lagogas electrical systems modules. MARAVEN

1993 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA)

  • New Lama Plant Control Building. MARAVEN

  • Block III Platforms, bridges and Booster's relief system. MARAVEN

  • Relocation and enlarge of rainstorm drainage stations: "LS-516A" Tía Juana, "LS-100" Lagunillas, "SAN ANDRES" and "LS-608" Bachaquero. MARAVEN

  • Gas Combustible Ceutagas-IV. MARAVEN

  • Porta-Booster-6 installation. Maracaibo Lake Block IX. MARAVEN

  • Maracaibo Lake Block III Booster's Facilities. MARAVEN

  • Maracaibo Lake Block VII Booster's I Facilities. MARAVEN

1992 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA)

  • Booster's foundation at Lake Block III. MARAVEN

  • Relocation and enlarge of rainstorm drainage stations: "LS-5", "PRINCIPAL" Lagunillas and "LS-604" Tía Juana. MARAVEN

  • Maracaibo Lake East Coast Emergency System. MARAVEN

  • Offshore foundations for Booster Modules at LAMA-IV and CINCOGAS-V Plants. MARAVEN

  • Power Plant at Mascio building. MARAVEN

  • Barges "GP-10" and "GP-18" mayor maintenance. MARAVEN

  • Potable water system at "SINAMAICA Lagoon" Zulia State Government

  • San Lorenzo Drainage. SUMANDES. MARAVEN

1991 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA)

  • Offshore foundations and platforms for Lake Block-VIII Boosters. MARAVEN

  • Procurement of 25 Motor pumps with 4500 M3/H capacity for Lake Maracaibo East Coast Drainage System. MARAVEN

  • Relocation and enlarge of rainstorm drainage stations: LS-16, Zulima and Area Industrial Lagoven. MARAVEN

  • 36” Post-tensioned offshore piles. CONINCA. Raymond of Venezuela

  • Offshore Mono-pile Structures. CONINCA. Raymond of Venezuela

  • Offshore Platforms Structures. CONINCA. Raymond of Venezuela

  • Onshore & Offshore Pre-Fabricated Structures. CONINCA. Raymond of Venezuela

1990 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA)

  • Emergency works at barge GP-18. MARAVEN

  • Relocation and enlarge of rainstorm drainage stations: "SAN MATEO" and "LS-406". MARAVEN

  • Telemetric System for Drainage Stations. MARAVEN

  • Miranda building Sport Facilities. MARAVEN

  • New Flow Station CPS-8. MARAVEN

  • Waste water system at Lake Maracaibo East Coast. MARAVEN

  • Lake Maracaibo Navigation Channels pipes paths. MARAVEN

1989 – Venezuela (as employee of Petroleos de Venezuela S.A. - PDVSA - or Inelectra)

  • Relocation and enlarge of "EL PUEBLO" rainstorm drainage station. MARAVEN

  • Ceuta town offshore walks ways. Zulia State Government

  • Design and Inspection of platforms and flares. Lama Plant relief system. MARAVEN

  • Basic Engineer for enlargement of Bachaquero dock. MARAVEN

  • Professor: Roads Design. Semesters 1 & 2. 1988. UCAB

  • Trucks filling out system ULE. LAGOVEN

  • Asphalt Materials SUMANDES. MARAVEN

  • Quality control for Bunker (Explosion proof) and Electrical Room, for PROPILVEN in “El Tablazo” Petrochemical Complex

1988 – Venezuela (as employee of Inelectra)

  • Revision of enclose/walkways/stairs. Siemens-Martin Steel factory. SIDOR

  • Design of steel and concrete structures (Flakes Pit, Crane Beams, and Stair Towers) and drainage ditches and pits enlargement. Seamless Pipes Plant. ITALIMPIANTI-SIDOR

  • Quality Control, and Buildings MTOs for the Seamless Pipes Plant. SIDOR

  • Design of Stair Towers for the Seamless Pipes Plant Buildings. SIDOR

1987 – Venezuela (as employee of Inelectra)

  • Alumina’s Main Silo support structure, platforms, stairs and other structures. VENALUM

  • Smoke Treatment Plants 9 & 10. VENALUM

  • Concrete Base for principal fans. AMUAY Refinery

  • Admission Duct TG-15 support structure. Booster replacement. AMUAY Refinery

  • Production Operation Division Tank Farm Reconditioning

  • Water Plants and Lagunillas North / South Clinics improvements

  • Shore Protection System and Tank Farm "La Solita" Reconditioning

  • AVAC rooms: Unigas-1, Ceutagas-1-2-Ext. Plants

1986 – Venezuela (as employee of Consultores Occidentales S.A. - COSA)

  • Conveyor "D" Galleria Design. VENALUM. Puerto Ordáz

  • Review of Waste Water Plant Project. Maracaibo Lake East Shore

  • Review of Oxidation Lagoon Project. PRODUZCA